Kitchen part 2, a restart in August 2004
-

Drilling the holes with an angle > 90 degrees
-

Yes ! the ceiling is almost finished !
-

Ok, the last one ... beams galore
-

Again, ceiling structure
-

Wooden beams for ceiling
-

Tiles on the other side of the kitchen
-

Blocked the big hole through the ceiling
-

Half finished beam structure for ceiling
-

Another view of the finished tiling
-

All the tiles on the right side are on
-

The latest cupboards have doors
-

The first tiles are on the wall !
-

Wooden corner profiles
-

Small board next to the sink
-

View on the brandnew worktop from outside
-

Worktop (dutch: aanrecht) finished
-

Busy cutting some board from a large piece with circular saw
-

Almost all boards are up the wall
-

The kitchen seen from the hall
-

The two last remaining cupboards finally in place
-

Our backgarden after mowing the grass
-

Material for the ceiling
-

Assembly of the cupboards in the livingroom
-

One board done
-

Board for the wall, plus outlets
